Armstrong Field & River Hawk Walk

  • Kittanning, Pennsylvania
  • Completed September 2018
  • New Construction
  • 12,500 square feet
  • 3,000 seat stadium

In 2014, Armstrong School District constructed a new middle school and high school that merged schools in the Ford City and Kittanning school districts. Due to budget constraints at the time, the new athletic stadium was placed on hold.

In 2016, the district determined that they were prepared to move ahead with the stadium project with a more limited scope and budget. IKM was selected to work with the district and the community to design a new synthetic turf football and soccer field, track and field facilities, and field house complete with restrooms, locker rooms, coaches’ offices, training facili­ties, and a concession stand.

As the unifying piece of this campus development project and a focal point of the entrance experience, IKM de­signed a welcoming gateway entrance and connected the new stadium to the middle school and high school with a pedestrian walkway dubbed the “River Hawk Walk.”

The new stadium seats 3,000 fans and host both school district and com­munity functions. Resilient materials and flexible use of space contribute to the state-of-the art athletic complex, purposefully built to support and cele­brate student athletes.

View more projects from Education or K-12

Interested in building your own project?

Call us at (412) 281-1337